Current Location:
Home
> News > Company News

Shandong Laixi Woer Wind Power Project was Successfully Connected to the Grid

Date: 2021 - 12 - 31    Fonts:[ Big Middle Small ]

  At 9:28 am on December 31, 2021, 100MW Tangjiazhuang Wind Power Project and 48MW Malianzhuang Wind Power Project, which were invested in and constructed by the Company in Laixi City, Shandong Province, were officially connected to the grid. Therefore, the Laixi Wind Power Project realized the “Double Operation” at the end of the year, opening a new mode of operation for the Company.

  After the Project was connected to the grid, its annual on-grid electricity is 225.935 million kilowatt hours. Compared with a coal-fired power plant with the same scale, it can save 71,183 tons of standard coal, reduce 163,720 tons of carbon dioxide emission, 149.5 tons of dust, 1,195.9 tons of sulfur dioxide, and 16.4 tons of carbon monoxide for the country each year. Therefore it has a positive effect on local environmental protection and reducing air pollution, and creating obvious energy-saving, environmental and social benefits, contributing to the "3060" Carbon Peaking and Carbon Neutrality Goals .